Moravian Road Bridge
April 2, 2011
Place: Clinton (Township of)
Facility Carried: MORAVIAN DR.
Feature Intersected: CLINTON RIVER
Location: 0.5 MI SOUTH OF CASS AVE.
Bridge Material and Design: Steel Stringer/Multi-beam or Girder
Sufficiency Rating: 2 %
Structural Evaluation: Basically intolerable requiring high priority of replacement
Structure Length: 61.5 meters
Year Built: 1930
Year Reconstructed: 1970
NBI Structure Number: 50200009000B010
This bridge is Structurally Deficient
Functional Classification: Urban Minor Arterial
Service On Bridge: Highway
Service Under Bridge: Waterway
Lanes On Structure: 2
Structure Length: 61.5 m
Bridge Roadway Width: 6.7 m
Operating Rating: 34.5 Metric Tons
Number of Spans in Main Unit: 4 Spans
Material Design: Steel
Design Construction: Stringer/Multi-beam or Girder
Scour: Foundations determined to be stable for assessed scour conditions
Bridge Railing: Does not meet currently acceptable standards.
Structural Evaluation: Basically intolerable requiring high priority of replacement
Water Adequacy Evaluation: Equal to present minimum criteria
Estimated Total Improvement Project Cost: $2000
Year of Project Cost Estimate: 0000
Average Daily Traffic: 8592
Year of Average Daily Traffic: 1996
Sufficiency Rating: 2 %